Scotswood overall site analysis showing strengths, weaknesses, opportunities and threats
Site Location Plan
Indicative Masterplan with Planning Application Boundary
Plan showing Pedestrian, Cycle and Bus Links to Phase 1
Indicative Visualisation showing Massing of Overall Development
Indicative Masterplan with Planning Application Boundary
Scotswood Masterplan area showing phasing of implementation with a breakdown of associated indicative works and timescales
Indicative Sketch Perspective of Phase 1 Development showing eastern approach to Sales Village from Whitehouse Road Entrance
Both the overall masterplan site and the Phase 1 Development can be approached and accessed from a number of entrances. The information provided focuses on two entrances to the Phase 1 Development. The first is the eastern approach to the Phase 1 Sales Village via Whitehouse Road. The second is the Armstrong Road Streetscene along the northern boundary of the Phase 1 Development.
Plan showing location of Armstrong Road in relation to the Phase 1 Development
Both the overall masterplan site and the Phase 1 Development can be approached and accessed from a number of entrances. The information provided focuses on two entrances to the Phase 1 Development. The first is the eastern approach to the Phase 1 Sales Village via Whitehouse Road. The second is the Armstrong Road Streetscene along the northern boundary of the Phase 1 Development.
Indicative Sketch Perspective showing eastern approach to Sales Village from Whitehouse Road Entrance
Both the overall masterplan site and the Phase 1 Development can be approached and accessed from a number of entrances. The information provided focuses on two entrances to the Phase 1 Development. The first is the eastern approach to the Phase 1 Sales Village via Whitehouse Road. The second is the Armstrong Road Streetscene along the northern boundary of the Phase 1 Development.
Sketch Elevation showing Armstrong Road Streetscene along the northern boundary of the Phase 1 Development
Both the overall masterplan site and the Phase 1 Development can be approached and accessed from a number of entrances. The information provided focuses on two entrances to the Phase 1 Development. The first is the eastern approach to the Phase 1 Sales Village via Whitehouse Road. The second is the Armstrong Road Streetscene along the northern boundary of the Phase 1 Development.
Plan showing Pedestrian, Cycle and Bus Links
Plan showing Pedestrian, Cycle and Bus Links
Plan showing revised location for Bus Stop 1
Plan showing revised location for Bus Stop 2
Plan showing Pedestrian, Cycle and Bus Links
Extract from the 'Sustainable Travel Information' Document
Plan showing Phase 1 homes
HCA grant funding for phase 1 of the scheme has been secured by Tees Valley Housing that enables New Tyne West Development Company to offer the following in respect of the affordable housing provision within phase 1 of the project:-
To deliver 36 dwellings for Affordable Rent of which a minimum of 30% will be 3 bedroom or larger and the balance will be no less than 2 bedrooms.
To deliver 22 dwellings for Affordable Home Ownership as defined in Planning Policy Statement 3 of which a minimum of 80% should be 3 and 4 bedroom or larger and the balance should be no less than 2 bedrooms.
To transfer all 58 affordable housing dwellings to Tees Valley on or prior to construction completion to ensure that if any of the dwellings are sold at a later date the grant monies can be recycled into new affordable provision.
To complete 29 of the affordable dwellings prior to the occupation of the 190th dwelling.
To complete all 58 affordable dwellings prior to the occupation of the 340th dwelling.
To provide quarterly reports to the City Council detailing the affordable dwellings which have been started on site and those that have been completed during the previous 3 months.
Character Zones Diagram (Page 7 of the Design and Access Statement)
Building Height Strategy (Page 11 of the Design and Access Statement)
Example of Character Area Principles (Page 38 of the Design and Access Statement)
Introduction to Housetypes and Elevational Design (Page 18 of the Design and Access Statement)
Elevational Concept Analysis (Page 22 of the Design and Access Statement)
Elevational Design (Page 23 of the Design and Access Statement)
Detail Option Studies (Page 25 of the Design and Access Statement)
Schedule of Phase 1 Facing Materials and Colours
Phase 1 Facing Materials Key Plan (to be read in conjunction with Schedule of Phase 1 Facing Materials and Colours)
Phase 1 Roof Strategy Plan
Landscape Strategy Plan (Phase 1)
Example of Detailed Planting Sheet
Indicative Design of the Linear Park (Page 41 of the Design and Access Statement)
Plan of Enhancement Works to Hodgkin Park
Landscape Strategy Plan (Phase 1)
Indicative Hard Landscaping Details
Photograph taken from a balcony at The Rise showing view southwards over the River Tyne to Gateshead
PR Photograph taken from the site showing view southwards over the River Tyne to Gateshead
PR Photograph taken from the site showing view southwards over the River Tyne to Gateshead
Plan of Enhancement Works to Hodgkin Park
Part of the development involved enhancement works to Hodgkin Park which is immediately adjacent to the Phase 1 Development.
Plan showing Interface between the Phase 1 Development and adjacent Hodgkin Park
Part of the development involved enhancement works to Hodgkin Park which is immediately adjacent to the Phase 1 Development.
Introduction to Street Hierarchy (Page 28 of the Design and Access Statement)
Artist's Impression of Various Character Areas within Phase One (Page 29 of the Design and Access Statement)
Indicative Sketch Perspective of Traffic Calmed Play Streets/Mews
Spatial Syntax Diagram for Phase 1 (Page 9 of the Design and Access Statement)
Plan showing location of Corner Turner Housetypes VW, 926 and 34.
Typical Elevations of Housetype VW
Typical Elevations of Housetype 926
Typical Elevations of Housetype 34
Plan showing Arrangement of Development into Perimeter Blocks (Page 10 of the Design and Access Statement)
Location and Integration of Art Installations within the Scheme (Page 13 of the Art Strategy)
Indicative Design of the Linear Park (Page 15 of the Art Strategy)
View and Interpretation Opportunities (Page 16 of the Art Strategy)
Orientation and Interpretation Opportunity (Page 22 of the Art Strategy)
Indicative Sketch Perspective of Traffic Calmed Play Streets/Mews
Accessible Routes Plan (Page 15 of the Design and Access Statement)
Typical Streetscenes
Typical Floor Plans (Page 20 of the Design and Access Statement)
Indicative Design of the Linear Park (Page 41 of the Design and Access Statement)
Curtilage Treatment Plan (Phase 1)
Boundary Treatment Details (1 of 2)
Boundary Treatment Details (2 of 2)
Examples of Boundary Treatment Option Studies (Page 43 of the Design and Access Statement)
Indicative Plan showing Generic Plot Access Arrangements
Plan showing Location of Bins and Shared Rear Access Routes
Indicative Plan showing Generic Plot Access Arrangements
Although every effort has been made to provide accurate content on these pages neither Built for Life nor any of its employees or residential developer contributors make any warranty, express or implied, or assume any legal liability or responsibility for the accuracy or completeness of any information contained on this site.
Content included by residential developers is not updated. Due to the nature of the content, changes are likely to happen post planning stages and so decisions on purchases must not be made with information held on this site. Please refer to the residential developer(s) concerned for up to date information.
Built for Life cannot be held responsible for the contents of any pages referenced by an external link. Reference herein to any company does not necessarily constitute or imply its endorsement or recommendation by Built for Life or any of its employees.