The Rise is the regeneration of a 60 ha site that had been derelict for more than half a century standing over pitshafts in the West End of Newcastle. The site had to reinvent itself to have any chance of sustaining a successful housing market so the city council led a JV Partnership to form the New Tyne West Development Company. The Scotswood Regeneration project is an innovative collaboration between the private sector; Keepmoat and Barratt, and the public sector; the Newcastle City Council, as well as local residents, in the delivery of area wide regeneration. The scheme exploits the site’s topography at the top of the Tyne valley with new house types with generous terraces to enjoy the views, plus attractive pricing to attract a mix of households. The scheme benefits from a site-wide district heating network from a central CHP energy centre which provides Code for Sustainable Homes level 4.

Integrating
into the neighbourhood

Scotswood overall site analysis showing strengths, weaknesses, opportunities and threats

Integrating
into the neighbourhood

Scotswood overall site analysis showing strengths, weaknesses, opportunities and threats

Integrating
into the neighbourhood

Site Location Plan

Integrating
into the neighbourhood

Site Location Plan

Integrating
into the neighbourhood

Indicative Masterplan with Planning Application Boundary

Integrating
into the neighbourhood

Indicative Masterplan with Planning Application Boundary

Integrating
into the neighbourhood

1. Connections

Plan showing Pedestrian, Cycle and Bus Links to Phase 1

Integrating
into the neighbourhood

1. Connections

Plan showing Pedestrian, Cycle and Bus Links to Phase 1

Integrating
into the neighbourhood

1. Connections

Indicative Visualisation showing Massing of Overall Development

Integrating
into the neighbourhood

1. Connections

Indicative Visualisation showing Massing of Overall Development

Integrating
into the neighbourhood

1. Connections

Indicative Masterplan with Planning Application Boundary

Integrating
into the neighbourhood

1. Connections

Indicative Masterplan with Planning Application Boundary

Integrating
into the neighbourhood

1. Connections

Scotswood Masterplan area showing phasing of implementation with a breakdown of associated indicative works and timescales

Integrating
into the neighbourhood

1. Connections

Scotswood Masterplan area showing phasing of implementation with a breakdown of associated indicative works and timescales

Integrating
into the neighbourhood

1. Connections

Indicative Sketch Perspective of Phase 1 Development showing eastern approach to Sales Village from Whitehouse Road Entrance

Both the overall masterplan site and the Phase 1 Development can be approached and accessed from a number of entrances. The information provided focuses on two entrances to the Phase 1 Development. The first is the eastern approach to the Phase 1 Sales Village via Whitehouse Road. The second is the Armstrong Road Streetscene along the northern boundary of the Phase 1 Development.

Integrating
into the neighbourhood

1. Connections

Indicative Sketch Perspective of Phase 1 Development showing eastern approach to Sales Village from Whitehouse Road Entrance

Both the overall masterplan site and the Phase 1 Development can be approached and accessed from a number of entrances. The information provided focuses on two entrances to the Phase 1 Development. The first is the eastern approach to the Phase 1 Sales Village via Whitehouse Road. The second is the Armstrong Road Streetscene along the northern boundary of the Phase 1 Development.

Integrating
into the neighbourhood

1. Connections

Plan showing location of Armstrong Road in relation to the Phase 1 Development

Both the overall masterplan site and the Phase 1 Development can be approached and accessed from a number of entrances. The information provided focuses on two entrances to the Phase 1 Development. The first is the eastern approach to the Phase 1 Sales Village via Whitehouse Road. The second is the Armstrong Road Streetscene along the northern boundary of the Phase 1 Development.

Integrating
into the neighbourhood

1. Connections

Plan showing location of Armstrong Road in relation to the Phase 1 Development

Both the overall masterplan site and the Phase 1 Development can be approached and accessed from a number of entrances. The information provided focuses on two entrances to the Phase 1 Development. The first is the eastern approach to the Phase 1 Sales Village via Whitehouse Road. The second is the Armstrong Road Streetscene along the northern boundary of the Phase 1 Development.

Integrating
into the neighbourhood

1. Connections

Indicative Sketch Perspective showing eastern approach to Sales Village from Whitehouse Road Entrance

Both the overall masterplan site and the Phase 1 Development can be approached and accessed from a number of entrances. The information provided focuses on two entrances to the Phase 1 Development. The first is the eastern approach to the Phase 1 Sales Village via Whitehouse Road. The second is the Armstrong Road Streetscene along the northern boundary of the Phase 1 Development.

Integrating
into the neighbourhood

1. Connections

Indicative Sketch Perspective showing eastern approach to Sales Village from Whitehouse Road Entrance

Both the overall masterplan site and the Phase 1 Development can be approached and accessed from a number of entrances. The information provided focuses on two entrances to the Phase 1 Development. The first is the eastern approach to the Phase 1 Sales Village via Whitehouse Road. The second is the Armstrong Road Streetscene along the northern boundary of the Phase 1 Development.

Integrating
into the neighbourhood

1. Connections

Sketch Elevation showing Armstrong Road Streetscene along the northern boundary of the Phase 1 Development

Both the overall masterplan site and the Phase 1 Development can be approached and accessed from a number of entrances. The information provided focuses on two entrances to the Phase 1 Development. The first is the eastern approach to the Phase 1 Sales Village via Whitehouse Road. The second is the Armstrong Road Streetscene along the northern boundary of the Phase 1 Development.

Integrating
into the neighbourhood

1. Connections

Sketch Elevation showing Armstrong Road Streetscene along the northern boundary of the Phase 1 Development

Both the overall masterplan site and the Phase 1 Development can be approached and accessed from a number of entrances. The information provided focuses on two entrances to the Phase 1 Development. The first is the eastern approach to the Phase 1 Sales Village via Whitehouse Road. The second is the Armstrong Road Streetscene along the northern boundary of the Phase 1 Development.

Integrating
into the neighbourhood

2. Facilities and services

Plan showing Pedestrian, Cycle and Bus Links

Integrating
into the neighbourhood

2. Facilities and services

Plan showing Pedestrian, Cycle and Bus Links

Integrating
into the neighbourhood

2. Facilities and services

Plan showing Pedestrian, Cycle and Bus Links

Integrating
into the neighbourhood

2. Facilities and services

Plan showing Pedestrian, Cycle and Bus Links

Integrating
into the neighbourhood

2. Facilities and services

Plan showing revised location for Bus Stop 1

Integrating
into the neighbourhood

2. Facilities and services

Plan showing revised location for Bus Stop 1

Integrating
into the neighbourhood

2. Facilities and services

Plan showing revised location for Bus Stop 2

Integrating
into the neighbourhood

2. Facilities and services

Plan showing revised location for Bus Stop 2

Integrating
into the neighbourhood

3. Public transport

Plan showing Pedestrian, Cycle and Bus Links

Integrating
into the neighbourhood

3. Public transport

Plan showing Pedestrian, Cycle and Bus Links

Integrating
into the neighbourhood

3. Public transport

Extract from the 'Sustainable Travel Information' Document

Integrating
into the neighbourhood

3. Public transport

Extract from the 'Sustainable Travel Information' Document

Integrating
into the neighbourhood

4. Meeting local housing requirements

Plan showing Phase 1 homes

HCA grant funding for phase 1 of the scheme has been secured by Tees Valley Housing that enables New Tyne West Development Company to offer the following in respect of the affordable housing provision within phase 1 of the project:-

To deliver 36 dwellings for Affordable Rent of which a minimum of 30% will be 3 bedroom or larger and the balance will be no less than 2 bedrooms.

To deliver 22 dwellings for Affordable Home Ownership as defined in Planning Policy Statement 3 of which a minimum of 80% should be 3 and 4 bedroom or larger and the balance should be no less than 2 bedrooms.

To transfer all 58 affordable housing dwellings to Tees Valley on or prior to construction completion to ensure that if any of the dwellings are sold at a later date the grant monies can be recycled into new affordable provision.

To complete 29 of the affordable dwellings prior to the occupation of the 190th dwelling.

To complete all 58 affordable dwellings prior to the occupation of the 340th dwelling.

To provide quarterly reports to the City Council detailing the affordable dwellings which have been started on site and those that have been completed during the previous 3 months.

Integrating
into the neighbourhood

4. Meeting local housing requirements

Plan showing Phase 1 homes

HCA grant funding for phase 1 of the scheme has been secured by Tees Valley Housing that enables New Tyne West Development Company to offer the following in respect of the affordable housing provision within phase 1 of the project:-

To deliver 36 dwellings for Affordable Rent of which a minimum of 30% will be 3 bedroom or larger and the balance will be no less than 2 bedrooms.

To deliver 22 dwellings for Affordable Home Ownership as defined in Planning Policy Statement 3 of which a minimum of 80% should be 3 and 4 bedroom or larger and the balance should be no less than 2 bedrooms.

To transfer all 58 affordable housing dwellings to Tees Valley on or prior to construction completion to ensure that if any of the dwellings are sold at a later date the grant monies can be recycled into new affordable provision.

To complete 29 of the affordable dwellings prior to the occupation of the 190th dwelling.

To complete all 58 affordable dwellings prior to the occupation of the 340th dwelling.

To provide quarterly reports to the City Council detailing the affordable dwellings which have been started on site and those that have been completed during the previous 3 months.

Creating a Place

5. Character

Character Zones Diagram (Page 7 of the Design and Access Statement)

Creating a Place

5. Character

Character Zones Diagram (Page 7 of the Design and Access Statement)

Creating a Place

5. Character

Building Height Strategy (Page 11 of the Design and Access Statement)

Creating a Place

5. Character

Building Height Strategy (Page 11 of the Design and Access Statement)

Creating a Place

5. Character

Example of Character Area Principles (Page 38 of the Design and Access Statement)

Creating a Place

5. Character

Example of Character Area Principles (Page 38 of the Design and Access Statement)

Creating a Place

5. Character

Introduction to Housetypes and Elevational Design (Page 18 of the Design and Access Statement)

Creating a Place

5. Character

Introduction to Housetypes and Elevational Design (Page 18 of the Design and Access Statement)

Creating a Place

5. Character

Elevational Concept Analysis (Page 22 of the Design and Access Statement)

Creating a Place

5. Character

Elevational Concept Analysis (Page 22 of the Design and Access Statement)

Creating a Place

5. Character

Elevational Design (Page 23 of the Design and Access Statement)

Creating a Place

5. Character

Elevational Design (Page 23 of the Design and Access Statement)

Creating a Place

5. Character

Detail Option Studies (Page 25 of the Design and Access Statement)

Creating a Place

5. Character

Detail Option Studies (Page 25 of the Design and Access Statement)

Creating a Place

5. Character

Schedule of Phase 1 Facing Materials and Colours

Creating a Place

5. Character

Schedule of Phase 1 Facing Materials and Colours

Creating a Place

5. Character

Phase 1 Facing Materials Key Plan (to be read in conjunction with Schedule of Phase 1 Facing Materials and Colours)

Creating a Place

5. Character

Phase 1 Facing Materials Key Plan (to be read in conjunction with Schedule of Phase 1 Facing Materials and Colours)

Creating a Place

5. Character

Phase 1 Roof Strategy Plan

Creating a Place

5. Character

Phase 1 Roof Strategy Plan

Creating a Place

5. Character

Landscape Strategy Plan (Phase 1)

Creating a Place

5. Character

Landscape Strategy Plan (Phase 1)

Creating a Place

5. Character

Example of Detailed Planting Sheet

Creating a Place

5. Character

Example of Detailed Planting Sheet

Creating a Place

5. Character

Indicative Design of the Linear Park (Page 41 of the Design and Access Statement)

Creating a Place

5. Character

Indicative Design of the Linear Park (Page 41 of the Design and Access Statement)

Creating a Place

5. Character

Plan of Enhancement Works to Hodgkin Park

Creating a Place

5. Character

Plan of Enhancement Works to Hodgkin Park

Creating a Place

5. Character

Landscape Strategy Plan (Phase 1)

Creating a Place

5. Character

Landscape Strategy Plan (Phase 1)

Creating a Place

5. Character

Indicative Hard Landscaping Details

Creating a Place

5. Character

Indicative Hard Landscaping Details

Creating a Place

6. Working with the site and context

Photograph taken from a balcony at The Rise showing view southwards over the River Tyne to Gateshead

Creating a Place

6. Working with the site and context

Photograph taken from a balcony at The Rise showing view southwards over the River Tyne to Gateshead

Creating a Place

6. Working with the site and context

PR Photograph taken from the site showing view southwards over the River Tyne to Gateshead

Creating a Place

6. Working with the site and context

PR Photograph taken from the site showing view southwards over the River Tyne to Gateshead

Creating a Place

6. Working with the site and context

PR Photograph taken from the site showing view southwards over the River Tyne to Gateshead

Creating a Place

6. Working with the site and context

PR Photograph taken from the site showing view southwards over the River Tyne to Gateshead

Creating a Place

6. Working with the site and context

Plan of Enhancement Works to Hodgkin Park

Part of the development involved enhancement works to Hodgkin Park which is immediately adjacent to the Phase 1 Development.

Creating a Place

6. Working with the site and context

Plan of Enhancement Works to Hodgkin Park

Part of the development involved enhancement works to Hodgkin Park which is immediately adjacent to the Phase 1 Development.

Creating a Place

6. Working with the site and context

Plan showing Interface between the Phase 1 Development and adjacent Hodgkin Park

Part of the development involved enhancement works to Hodgkin Park which is immediately adjacent to the Phase 1 Development.

Creating a Place

6. Working with the site and context

Plan showing Interface between the Phase 1 Development and adjacent Hodgkin Park

Part of the development involved enhancement works to Hodgkin Park which is immediately adjacent to the Phase 1 Development.

Creating a Place

7. Creating well defined streets and spaces

Introduction to Street Hierarchy (Page 28 of the Design and Access Statement)

Creating a Place

7. Creating well defined streets and spaces

Introduction to Street Hierarchy (Page 28 of the Design and Access Statement)

Creating a Place

7. Creating well defined streets and spaces

Artist's Impression of Various Character Areas within Phase One (Page 29 of the Design and Access Statement)

Creating a Place

7. Creating well defined streets and spaces

Artist's Impression of Various Character Areas within Phase One (Page 29 of the Design and Access Statement)

Creating a Place

7. Creating well defined streets and spaces

Indicative Sketch Perspective of Traffic Calmed Play Streets/Mews

Creating a Place

7. Creating well defined streets and spaces

Indicative Sketch Perspective of Traffic Calmed Play Streets/Mews

Creating a Place

7. Creating well defined streets and spaces

Spatial Syntax Diagram for Phase 1 (Page 9 of the Design and Access Statement)

Creating a Place

7. Creating well defined streets and spaces

Spatial Syntax Diagram for Phase 1 (Page 9 of the Design and Access Statement)

Creating a Place

7. Creating well defined streets and spaces

Plan showing location of Corner Turner Housetypes VW, 926 and 34.

Creating a Place

7. Creating well defined streets and spaces

Plan showing location of Corner Turner Housetypes VW, 926 and 34.

Creating a Place

7. Creating well defined streets and spaces

Typical Elevations of Housetype VW

Creating a Place

7. Creating well defined streets and spaces

Typical Elevations of Housetype VW

Creating a Place

7. Creating well defined streets and spaces

Typical Elevations of Housetype 926

Creating a Place

7. Creating well defined streets and spaces

Typical Elevations of Housetype 926

Creating a Place

7. Creating well defined streets and spaces

Typical Elevations of Housetype 34

Creating a Place

7. Creating well defined streets and spaces

Typical Elevations of Housetype 34

Creating a Place

8. Easy to find your way around

Plan showing Arrangement of Development into Perimeter Blocks (Page 10 of the Design and Access Statement)

Creating a Place

8. Easy to find your way around

Plan showing Arrangement of Development into Perimeter Blocks (Page 10 of the Design and Access Statement)

Creating a Place

8. Easy to find your way around

Location and Integration of Art Installations within the Scheme (Page 13 of the Art Strategy)

Creating a Place

8. Easy to find your way around

Location and Integration of Art Installations within the Scheme (Page 13 of the Art Strategy)

Creating a Place

8. Easy to find your way around

Indicative Design of the Linear Park (Page 15 of the Art Strategy)

Creating a Place

8. Easy to find your way around

Indicative Design of the Linear Park (Page 15 of the Art Strategy)

Creating a Place

8. Easy to find your way around

View and Interpretation Opportunities (Page 16 of the Art Strategy)

Creating a Place

8. Easy to find your way around

View and Interpretation Opportunities (Page 16 of the Art Strategy)

Creating a Place

8. Easy to find your way around

Orientation and Interpretation Opportunity (Page 22 of the Art Strategy)

Creating a Place

8. Easy to find your way around

Orientation and Interpretation Opportunity (Page 22 of the Art Strategy)

Street & Home

9. Streets for all

Indicative Sketch Perspective of Traffic Calmed Play Streets/Mews

Street & Home

9. Streets for all

Indicative Sketch Perspective of Traffic Calmed Play Streets/Mews

Street & Home

9. Streets for all

Accessible Routes Plan (Page 15 of the Design and Access Statement)

Street & Home

9. Streets for all

Accessible Routes Plan (Page 15 of the Design and Access Statement)

Street & Home

9. Streets for all

Typical Streetscenes

Street & Home

9. Streets for all

Typical Streetscenes

Street & Home

9. Streets for all

Typical Floor Plans (Page 20 of the Design and Access Statement)

Street & Home

9. Streets for all

Typical Floor Plans (Page 20 of the Design and Access Statement)

Street & Home

10. Car parking

Street & Home

10. Car parking

Street & Home

11. Public and private spaces

Indicative Design of the Linear Park (Page 41 of the Design and Access Statement)

Street & Home

11. Public and private spaces

Indicative Design of the Linear Park (Page 41 of the Design and Access Statement)

Street & Home

11. Public and private spaces

Curtilage Treatment Plan (Phase 1)

Street & Home

11. Public and private spaces

Curtilage Treatment Plan (Phase 1)

Street & Home

11. Public and private spaces

Boundary Treatment Details (1 of 2)

Street & Home

11. Public and private spaces

Boundary Treatment Details (1 of 2)

Street & Home

11. Public and private spaces

Boundary Treatment Details (2 of 2)

Street & Home

11. Public and private spaces

Boundary Treatment Details (2 of 2)

Street & Home

11. Public and private spaces

Examples of Boundary Treatment Option Studies (Page 43 of the Design and Access Statement)

Street & Home

11. Public and private spaces

Examples of Boundary Treatment Option Studies (Page 43 of the Design and Access Statement)

Street & Home

12. External storage and amenity space

Indicative Plan showing Generic Plot Access Arrangements

Street & Home

12. External storage and amenity space

Indicative Plan showing Generic Plot Access Arrangements

Street & Home

12. External storage and amenity space

Plan showing Location of Bins and Shared Rear Access Routes

Street & Home

12. External storage and amenity space

Plan showing Location of Bins and Shared Rear Access Routes

Street & Home

12. External storage and amenity space

Indicative Plan showing Generic Plot Access Arrangements

Street & Home

12. External storage and amenity space

Indicative Plan showing Generic Plot Access Arrangements

Content Disclaimer

Although every effort has been made to provide accurate content on these pages neither Built for Life nor any of its employees or residential developer contributors make any warranty, express or implied, or assume any legal liability or responsibility for the accuracy or completeness of any information contained on this site.

Content included by residential developers is not updated. Due to the nature of the content, changes are likely to happen post planning stages and so decisions on purchases must not be made with information held on this site. Please refer to the residential developer(s) concerned for up to date information.

Built for Life cannot be held responsible for the contents of any pages referenced by an external link. Reference herein to any company does not necessarily constitute or imply its endorsement or recommendation by Built for Life or any of its employees.